Tuesday, April 20, 2010

~ 15 April 2010 ~

problem : residual chlorine sampling chocked
venue : PD2
solution : clean the pipeline and test the water flow and pressure in the pipeline

residual chlorine system

pipe to overcome the chocked

serviced by the technician


~ 14 April 2010 ~

venue : service air compressor B
problem : auto drain valve pipeline joint leaking

in the service air compressor B

leaking at the pipeline



other than that, i also follow the technician to check and testing transmitter level at IP drum.

~ 13 April 2010 ~

check the diverter damper hydraulic panel 1A... the damper is use to control the exaust either to go to the bypass stack or HRSG....

diverter damper hydraulic panel 1A



system to check and measure the pressure


control system

test opening damper : 0% - open bypass
                                 100% - close bypass

problem = pressure low, therefor the damper cannot open for exaust to enter HRSG.

~ 12 April 2010 ~

2nd week of my internship... follow the technician to install CPFM sensor at combustor GT 1A...
also followed them to change OPS monitor at PD2...

Sunday, April 11, 2010

~ 5th day ( 9 april ) ~

follow the technician to do the loop test of the pipe line... the pipe that the oil flow...

pump the air to the pipe line

i'm trying to do the test

Mr. Ruslan set up the multimeter before do the loop test


i follow the technician to do the valve test at the gas valve... same procedure as the oil valve that we test yesterday....

our technician with japanese technician

instruments to do the test

thermocouple ( put at the starting unit )

~ 4th day ( 8 april ) ~

follow the technician to valve room under the gas turbine... the gas turbine is under overhall, therefor there is so much dusk in the valve room.... we have to wear musk... the valve is contain of oil... the valve is control the percentage of oil that flow...

in the valve room

dailgauge

control valve of oil

positional transmitter

on off valve... binary valve

~ 3rd day ( 7 april ) ~

walkdown to Tuanku Ja'afar Power Station (TJPS)... PD1, turbine system, control room, intake channel, outfall, demineralize water pump n etc... guieded by Mr Nik Yang...

~ 1st day ( 5 april ) ~

wake up early in the morning... with so many feeling.... blend together... scared, worried, excited, weird...
1st day = induction day.... briefing bout Tuanku Ja'afar Power Station management, organizational structure, turbine system, safety and environment.... briefing by Haji Amir n Mr Jasni...

in the induction room... only me, myself n I... trainee...

turbine system...

questions to answer...