Thursday, June 17, 2010

~ 11 May 2010 ~

Location : Prayer Room (male) CMN building PD2
Defect : exhaust fan did not function

- exaust fan is use to absorb hot air in the room to out.
- it cannot function because it did not connect to supply
- no calbe connected to it. supposely, there are cable connect for supply



Location : Generator Transformer 1B
Function GTx : to step-up voltage from 15kV to 275kV
OLTC (on load tap changer) : to change transformer output voltage

Breakdown Voltage (BDV) test
- to check either the oil is good insulator or not.
- in the transformer, oil is use as a insulator.
- test : inject 60kV to the oil
- the oil already put inside the machine
- it has a specific machine for this test
- the test is repeated 5 to 6 times. to get the accurate result.
- gap 2.5mm


oil put inside the white box


~ 10 May 2010 ~

Location : Gas storage building
Defect : CCTV have problem
solution : change with new cctv





Location : GT1B OAP
Work : change contactor
- change contacter in the breaker because the contacter altready broken and overload
- motor protection realy : protect breaker and motor if there is overload, overcurrent

new contactor

contactor had problem

motor protection relay

~ 8 May 2010 ~

Location : Transformer
Work : Generator Tx GT1B and station Tx ST1B servicing works.

Location : Breaker Bus-Tie PD1
Work : Servicing 415V breaker bus-tie
- 425V UAB1A BRD bus-tie
-check continuity = open 99.9 ohms, close = 0.08, 0.07, 0.08, 0.08 ohms
-ohm balance (phase to phase) = cannot short
- servicing 415V UAB1A BRD incoming = 0.22, 0.22, 0.32, 0.32 ohms

Procedure to service breaker bus-tie and incoming.
1. off ATS
2. select local mode
3. rack-out breaker
4. service breaker
5. rack-in breaker
6. reset alarm
7. select remote mode
8. on ATS
9. close bus-tie breaker
10. then incoming breaker will automatically open
11. select local breaker incoming
12. rack-out breaker
13. service breaker
14. rack-in breaker
15. reset alarm
16. select remote
17. close breaker incoming
18. the automatic the bus-tie breaker will open

~ 7 May 2010 ~

Location : HRSG 1A
Work : Control valve ( motorize valve ) cannot open 100%

- use WD 40 to smooth the valve function
- when the valve is close ( zero) it will send red light, if open (100%) send green light (signal).
- use variable resistor to adjust the valve (open/close)
- valve 'berkarat", therefore spray with WD 40
- normally, motorize valve is for isolating





Location : GT Package 1A
Work : Service and clean-up air conditioner
- the air conditioner in the GT Package use 3-phase system. Normally, for house it only use 1-phse.

-clean the air-cond fan (filter)
- if the filter is dirty, it will automatically off (stop)
- the compressor will function after 3 minutes the switch on.
- if in the GT Package already cold, the air cond fan will automatically stop (off)



Location : HRSG 1A
Work : Repair CCTV
- change with new one ( high resolution color cctv camera )



~ 6 May 2010 ~

Location : Battery Room (PD1)
Work : clean-up the battery from dust and check the level of the water in the battery.
- if the water level is too low, under the rate, it have to be top up






Location : Administration Building
Work : pasang and adjust sportlight



~ 5 May 2010 ~

Location : Theaterate
Work : Troubleshoot air-conditioner

- supposely, both motors function for the air cond but only one motor can function. The other one have problem.
- the problem is the connection is wrong and therefore have to change the connection
- compressor 1 (run), compressor 2 ( not run)


the connection

compressor of the air cond




Location : Auxilary transformer
Work : Clean up the transformer

Generator transformer - to step-up the generator voltage of 15kV to the system voltage of 275kV
Station transformer - to step-down the system voltage of 275kV to the station board voltage of 6.6kV

Thursday, May 20, 2010

~ 4 May 2010 ~

location : PD2
defect : motor viper extraction cannot stop

location : black start diesel generator (BSDG)
- check battery : 24V DC battery for start up
- use hydrometer to check water level = 1.28
- use multimeter to check the voltage = 12.30V
- the battery have to check because it will be use as back up when do the blackout test this Sunday (9 May)
- battery: back up for NGR (neutral ground resistor)
- EDG (emergency diesel generator) : to energize station essential board and provide emergency AC supply in case of normal AC power supply failure.

6.6kV --> EDG --> step down 415V --> auxilary Tx




~ 3 May 2010 ~

location : GT1B (PD1)

1) servicing GMCB (general main circuit breaker)
- GMCB is use to connect or isolate generator transformer from the grid.
- there are 3 unites of GMCB, one for each of the two GT's and ST's.
- GMCB uses a hydraulic spring mechanism in order to make or break the circuit.

2) step down the GT1B excitation transformer

generator (15kV) --> excitation transformer (830Vac) --> thyristor (change to DC) --> rotor

3) measure PI at the GMCB
- reading PI (polarization index) must greater than 1.5. it is better if can get greater than 2.

in the GMCB


PI test

~ 30 April 2010 ~

1) change the inverter because it has problem.
2) manually change the setting of the inverter.

Inverter (frequency drive) is use to change AC to AC. In the inverter already have rectifier.
Rectifier is use to change DC to AC.

By using inverter, energy can be saved. The speed of the motor can be change by increase/decrease the H2.
Inverter also can control the speed of motor.


inverter... already setting...

motor that connect to inverter

location : GT Package 1B
preventive maintainance : do the servicing at the breaker ( vacuum circuit breaker)

- do the ohm balance
-check the continuity
- check the isolation resistance






~ 28 April 2010 ~

location : HRSG
preventive maintainance :
- check the motorize valve either open/close 100%
- use WD40 to smoothly the valve function

1) HRSG 1B LP steam unit pipe blow 180V valve
2) HRSG 1B LP drum continuose blow 180V valve
3) HRSG 1B LP inlet HDR drain 180V valve
4) HRSG 1B LP sh inlet pipe AV 180V valve

~ 27 April 2010 ~

location : Field Circuit Breaker
preventive maintainance :
1) to do servicing at the FCB
2) to do servicing at the thyristor

FCB counter = 537

~ 26 April 2010 ~

Follow the technician to do the maintaninance at the CCTV at the gas compressor building and at gas receiving station. It will be check every 4 months.

check list :
1) junction box - to check either it is ok or not, good condition or not. Also check either in the junction box is free from dust and water.
2) lens
3) stand CCTV

PTZ is one the camera that used for CCTV. It can zoom and move right or left.


junction box and stand of CCTV

in the junction box

~ 24 April 2010 ~

Overhaul for GT1B start today. Follow the technician of control and instrumentation (CNI) to open the thermocouple at GT1B.

MOI (major overhaul inspection).


thermocouple without the cable

thermocouple


technician open the thermocouple


~ 23 April 2010 ~

Venue : Water Treatment Plant
Defect : The switch is not touched ( valve )

This plant is to generate the specified quality and quantity of demineralized water.




~ 21 April 2010 ~

Join the technician to check the differential pressure gauge. The difference pressure between inlet and outlet limit until 0.2. If more than 0.2 it is not good. Have to check.

Wednesday, May 5, 2010

~ 19 April 2010 ~

problem : sump pump cannot cutoff
solve : to check level switch





Tuesday, April 20, 2010

~ 15 April 2010 ~

problem : residual chlorine sampling chocked
venue : PD2
solution : clean the pipeline and test the water flow and pressure in the pipeline

residual chlorine system

pipe to overcome the chocked

serviced by the technician